Language Dropdown

Professional office design, inspire your unlimited possibilities!

Inspiring the workplaces

we're here to help you

Commercial Development | Commercial Design Service Process

Initial understanding of the client's business needs
Find an Office/Interior Design Planning
Total Estimated Requirements/Square footage
Simple Design Planning
Or need engineering management
Rental and Moving Time
Process Progress Arrangement
Head Office Requirements

01. Preliminary Negotiations

Communication

Provide office location
The designer visited the site to take measurements and photographs of the site survey to confirm the details of the site, such as the electrical and mechanical fire ceilings.
The new building was provided with CAD files by the client.
Preliminary mapping operations and site surveys were carried out.

02. On-site measurement

Measuring

In accordance with the needs of the client's business.
Carry out drawing proposals
Includes: Style Briefing Proposal

3 proposal configurations available
(Foreign designers + domestic design team)
Suggested Form Configuration.
Provide design direction recommendations
and preliminary engineering quotations.

03. Floorplanning

Planning

Signature Design/Engineering contract.
modifications in accordance with the design of the proposal.
Drawing with detail is performed.
Includes floor plan and elevation system drawings.
The relevant construction drawings are drawn.

04. Design Appointment

Design Commission

According to the changed and confirmed drawing, the
and budget planning for clients
Construction Material Selection
Furniture matching adjustment
Final quotation and adjustments are made.

05. Engineering Quotation

Quotation

After confirming the quotation
Confirming the scheduled construction period.
Manufacturers' work coordination
Relevant units to carry out plan review
Coordinate with architects for plan checking
Application Process for Government Rooms Launched

06. Engineering Execution

Contract

Construction supervision and on-site quality control of construction drawings
On-site labor safety inspections are conducted daily before entering the site
Regular daily reports on the progress of works

07. Engineering Management

Manage

Completion of works in accordance with the time schedule
Owner's Inspection and Handover

08.Completion and handover

Completed

Warranty and repair of all types of work and materials
Customer Service

09. Warranty Maintenance

warranty

Find world Best Services & Resources!

Project Development l Yi Yi Commercial Design

We're here to inspire your workplace.

CONTACT US

About Us

Menu
Email
Phone
Line
Line
Phone
Email